Steam Trap Maintenance Project in Steam Supply System within Power Plant
Replace abnormal Steam Trap equipment to reduce steam losses within the power plant

Project Description: Replace abnormal Steam Trap equipment to reduce steam losses within the power plant
Project Location: Steam Distribution Line within the power plant
Item | Target | Actual | Unit |
---|---|---|---|
1. Quantitative thermal energy target | 561,075 | 561,075 | MJ |
2. Quantitative savings target | 120,594 | 101,404 | Baht/year |
3. Investment amount | 40,000 | 20,890 | Baht |
4. Payback period | 0.33 | 0.21 | Years |